Tufts Street Reconstruction Initial Evaluation
In 2026, the City of Somerville completed the reconstruction of Tufts Street, following our community engagement process in 2023 and 2024. The redesign of Tufts Street is intended to improve safety and quality of life in the neighborhood by building accessible sidewalks and reducing the speed and volume of motor vehicle traffic. To understand whether the design changes are achieving our desired results, the City began collecting preliminary traffic data in fall 2026. Our preliminary data collection shows positive results.
Vehicle volumes
In 2025, prior to the start of construction, motor vehicle traffic volumes on Tufts Street were roughly 3,400 daily vehicles between Washington Street and Glen Street, and roughly 2,400 daily vehicles between Glen Street and Dell Street. In 2026, after project completion, we recorded approximately 2,400 daily vehicles between Washington Street and Glen Street, and roughly 2,300 daily vehicles between Glen Street and Dell Street. Although the volume changes are relatively modest 6% decrease for the northern section of Tufts Street, these changes represent a 29% decrease for the southern section!

Vehicle speeds
To compare vehicle speeds, we use two primary metrics. The first is a measure of the typical maximum speed for vehicles. Traffic engineers refer to this measure as the “85th percentile” speed, meaning that 85% of motor vehicles are recorded at or below that speed. In 2025, the typical maximum speeds on Tufts Street were 26 mph between Washington and Glen, and 29 mph between Glen and Dell. In 2026, after project completion, the typical maximum speeds on Tufts Street were 23 mph between Washington and Glen and 23mph between Glen and Dell.

Our second speed metric is a measure of speeding prevalence. We calculate the percentage of motor vehicles at or above 25mph both before and after a traffic calming project. For Tufts Street, our 2025 pre-construction data indicated that 23% of motor vehicles were driving at or above 25 mph between Washington and Glen, and 43% of vehicles were driving at/above 25mph between Glen and Dell. After project completion, those rates had dropped to 8% between Washington and Glen, and 8% between Glen and Dell.

In our experience, it can take 6-12 months for people’s travel behavior to settle into a “new normal” after a major street redesign or traffic pattern change. The City will collect additional data in 2027 to support our evaluation of the Tufts Street Reconstruction project and we will publish those data for public review. But in the meantime, we are excited to share the preliminary findings of our speed and volume monitoring indicating that Tufts Street is safer and calmer than it was before the reconstruction project.