City contractors have been hard at work over recent weeks installing new sidewalks along Washington Street. Work began at Beacon Street on the even-numbered side of the street and is proceeding east toward Webster Avenue (continuing on the even-numbered side for the time being).

The first concrete sidewalks (pictured below) were recently poured along the stretch.




The open gravel space on the left will become a raised sidewalk-level protected bicycle lane later this season.

If you have questions about construction, please email construction@somervillema.gov or call the Engineering Division at 617-625-6600 ext. 5400.