Western Pearl Street Updated Design Feedback Survey
Thank you for taking the time to share your feedback on the Updated Design of Western Pearl Street. The City presented two design options to community members in May 2025. The City spent the past few months reviewing all the community feedback we collected on these design options, choosing one design direction, and advancing the design. We aim to hear your input to see how we can make further changes before finalizing the design and preparing for construction between 2026 and 2027.
Along with repaving the street and reconstructing the sidewalks to ensure accessibility, we aimed to develop a design that increased safety for all people traveling the street, provided reliable and sustainable transportation options, and incorporated more greenery. Our goal was to provide biking options in both directions in the project area to meet the intentions of the Somerville Bicycle Network Plan while maintaining some parking options and opportunities to enhance crosswalks and planted areas. The design was shaped by the many community members who shared with us their transportation safety concerns and their feedback on conceptual ideas.
For more details about the design:
- Review the October 4 Open House Posters.
- Check out the illustrated roll plan.
- Watch the recorded presentation about the Updated Design (available by October 10)
We now want to hear from you! Please take this 5 to10-minute survey to share your feedback on the design and a bit about yourself to help us learn better who we are reaching. You can also call us at 311 (617-666-3311) if you would prefer to conduct the survey over the phone or email your feedback to our team at transportation@somervillema.gov.