Western Pearl Street Reconstruction

Share Western Pearl Street Reconstruction on Facebook Share Western Pearl Street Reconstruction on Twitter Share Western Pearl Street Reconstruction on Linkedin Email Western Pearl Street Reconstruction link

As part of the City’s Pavement and Sidewalk Management program, the City plans to reconstruct sidewalks and repave Pearl Street from McGrath Highway to Medford Street. Since 2015, the City has taken a data driven approach to analyze street and sidewalk quality and prioritize locations rooted in equity, safety, and accessibility for this program. With the opportunity to reconstruct the street, the City aims to increase safety, improve accessibility, incorporate more sustainability, and create a more comfortable street. We aim to do this by:

  • Reconstructing all the sidewalks along Pearl Street from Medford Street to McGrath Highway,

As part of the City’s Pavement and Sidewalk Management program, the City plans to reconstruct sidewalks and repave Pearl Street from McGrath Highway to Medford Street. Since 2015, the City has taken a data driven approach to analyze street and sidewalk quality and prioritize locations rooted in equity, safety, and accessibility for this program. With the opportunity to reconstruct the street, the City aims to increase safety, improve accessibility, incorporate more sustainability, and create a more comfortable street. We aim to do this by:

  • Reconstructing all the sidewalks along Pearl Street from Medford Street to McGrath Highway, along with approximately 20 feet into intersecting streets
  • Repaving the street from sidewalk curb to sidewalk curb
  • Adding accessible curb ramps to all existing crosswalks
  • Exploring opportunities for new crossings in addition to installing safety improvements like raised crosswalks/intersection or curb extensions
  • Identifying locations for new trees, replacing tree stumps, and considering tree bump outs or expanding the tree wells to support tree longevity
  • Installing protected bicycle facilities
  • Incorporating “Clear Corners” at each intersection to increase the visibility for people driving turning or moving through the intersections

This segment of Pearl Street is designated for two-way protected bicycle facilities in the Somerville Bicycle Network Plan and codified in the Safe Streets Ordinance. Pearl Street is narrow enough that implementing two-way protected bike lanes would require removing all existing parking on the street. This narrow width could also limit the ability to shorten crossing distances with curb extensions, expand the sidewalk to provide more space for people walking and rolling, and provide curb access for activities like deliveries or some residential parking.

With these potential significant trade-offs, we want to facilitate a robust community engagement process to better understand the community’s needs for the street and explore options. These options may include providing one direction of protected bike facility on Pearl Street and using a different neighborhood street to serve the other direction. Another option may be to consider one-way motor vehicle travel on Pearl Street in order to achieve other community goals for the street.

From October through November 2024, we aim to gather your feedback on transportation safety concerns you have for the street and your priorities for the future. Over the winter, we will work on a concept design shaped by the feedback we heard in addition to analysis of data we aim to collect such as vehicle speed, vehicle volume, and parking utilization. In Spring 2025, we aim to publish a concept design and conduct another round of community engagement. Over the summer, we will work to refine the design to bring an updated version in Fall 2025 for more community input. We will then work to finalize the design to prepare for construction between 2026 and 2027.

To learn more about the project and keep up to date, please check out the information below and the materials in the toolbar.

Information in other languages

Si necesita ayuda en su idioma, comuníquese con nosotros a través de somervillema.gov/ContactSomerviva o llame al 311 (617-666-3311)      

Caso precise de assistência em seu idioma, entre em contato conosco por meio deste formulário online: somervillema.gov/ContactSomerviva ou ligue para 311 (617-666-3311)      

Si ou bezwen asistans nan lang ou a, kontakte nou nan somervillema.gov/ContactSomerviva oswa rele 311 (617-666-3311)    

यदि आफ्नो भाषामा सहायता चाहिन्छ भने कृपया सम्पर्क गर्नुहोस: www.somervillema.gov/ContactSomerviva गर्नुहोस् वा यो ३११ (६१७-६६६-३३११) / 311 (617-666-3311)   

如果您需要語言方面的協助 請撥打 311 (617-666-3311) 或於somervillema.gov/ContactSomerviva 聯絡 彩薩默: 移民事務辦公室。  

如果您需要语言方面的协助,请联系 (somervillema.gov/ContactSomerViva)或者请拨打 311(617-666-3311)。

  • Thank you for taking the time to share your feedback on the Updated Design of Western Pearl Street. The City presented two design options to community members in May 2025. The City spent the past few months reviewing all the community feedback we collected on these design options, choosing one design direction, and advancing the design. We aim to hear your input to see how we can make further changes before finalizing the design and preparing for construction between 2026 and 2027.

    Along with repaving the street and reconstructing the sidewalks to ensure accessibility, we aimed to develop a design that increased safety for all people traveling the street, provided reliable and sustainable transportation options, and incorporated more greenery. Our goal was to provide biking options in both directions in the project area to meet the intentions of the Somerville Bicycle Network Plan while maintaining some parking options and opportunities to enhance crosswalks and planted areas. The design was shaped by the many community members who shared with us their transportation safety concerns and their feedback on conceptual ideas.

    For more details about the design:

    We now want to hear from you! Please take this 5 to10-minute survey to share your feedback on the design and a bit about yourself to help us learn better who we are reaching. You can also call us at 311 (617-666-3311) if you would prefer to conduct the survey over the phone or email your feedback to our team at transportation@somervillema.gov.


    Take Survey
    Share Western Pearl Street Updated Design Feedback Survey on Facebook Share Western Pearl Street Updated Design Feedback Survey on Twitter Share Western Pearl Street Updated Design Feedback Survey on Linkedin Email Western Pearl Street Updated Design Feedback Survey link
  • Gracias por tomarse el tiempo de compartir su valoración sobre el diseño actualizado de Western Pearl Street. La ciudad presentó dos opciones de diseño a los miembros de la comunidad en mayo de 2025. La ciudad pasó los últimos meses revisando todos los aportes que recogimos de la comunidad sobre estas opciones de diseño, eligiendo y avanzando en una dirección de diseño. Buscamos escuchar su opinión para ver cómo podemos realizar más cambios antes de finalizar el diseño y preparar la construcción entre el 2026 y 2027. 

    Junto con repavimentar la calle y reconstruir las aceras para garantizar la accesibilidad, buscamos desarrollar un diseño que aumentara la seguridad para toda las personas transitando la calle, que brindara opciones de transporte fiables y sostenibles, y que incorporara más áreas verdes. Nuestra meta era brindar opciones en ambas direcciones en el área del proyecto para atender las intenciones del Plan de Red de Bicicletas de Somerville mientras se mantienen opciones de estacionamiento y oportunidades para mejorar los pasos peatonales y áreas con plantas. El diseño fue moldeado por los muchos miembros de la comunidad que compartieron con nosotros sus inquietudes de seguridad con el transporte y su aporte sobre ideas conceptuales. 

    ¡Queremos saber su opinión! Por favor realice esta encuesta de 5-10 minutos para compartir su opinión sobre el diseño y un poco sobre su persona para ayudarnos a conocer mejor con quién nos estamos comunicando. También puede llamarnos a través del 311 (617-666-3311) si prefiere realizar la encuesta por teléfono o envíe su opinión a nuestro equipo a través del email transportation@somervillema.gov. 


    Take Survey
    Share [Spanish] Encuesta de valoración del diseño actualizado de Western Pearl Street on Facebook Share [Spanish] Encuesta de valoración del diseño actualizado de Western Pearl Street on Twitter Share [Spanish] Encuesta de valoración del diseño actualizado de Western Pearl Street on Linkedin Email [Spanish] Encuesta de valoración del diseño actualizado de Western Pearl Street link
  • Obrigado por dedicar seu tempo para compartilhar suas opiniões sobre o Design Atualizado da Western Pearl Street. Em maio de 2025, a cidade apresentou duas opções de design aos membros da comunidade. Nos últimos meses, analisamos todo o feedback recebido, escolhemos uma direção de design e avançamos no projeto. Agora, queremos ouvir sua opinião para avaliar possíveis ajustes antes de finalizar o design e iniciar a construção, prevista para 2026–2027. 

    Além da recuperação do pavimento e da reconstrução das calçadas para garantir acessibilidade, buscamos criar um design que aumentasse a segurança para todos, oferecesse opções de transporte confiáveis e sustentáveis e incorporasse mais áreas verdes. O objetivo é disponibilizar faixas para bicicletas em ambos os sentidos na área do projeto, atendendo às diretrizes do Somerville Bicycle Network Plan, mantendo algumas vagas de estacionamento e oportunidades para melhorar faixas de pedestre e áreas arborizadas. 

    O design foi moldado pelas contribuições da comunidade, que compartilhou preocupações sobre segurança no transporte e feedback sobre ideias conceituais. 

    Agora queremos ouvir de você! Reserve 5 a 10 minutos para preencher esta pesquisa e compartilhar sua opinião sobre o design, além de algumas informações sobre você, para nos ajudar a entender melhor quem estamos alcançando. Você também pode ligar para 311 (617-666-3311) caso prefira responder a pesquisa por telefone, ou enviar seu feedback por e-mail para transportation@somervillema.gov. 


    Take Survey
    Share [Portuguese] Pesquisa de Feedback sobre o Design Atualizado da Western Pearl Street on Facebook Share [Portuguese] Pesquisa de Feedback sobre o Design Atualizado da Western Pearl Street on Twitter Share [Portuguese] Pesquisa de Feedback sobre o Design Atualizado da Western Pearl Street on Linkedin Email [Portuguese] Pesquisa de Feedback sobre o Design Atualizado da Western Pearl Street link
  • Mèsi paske w pran tan pou w pataje kòmantè w sou mizajou sou dizay ri “Western Pearl Street. Nan mwa me 2025, vil la te prezante de opsyon dizay bay moun nan kominote a. Pandan dènye mwa yo, vil la te egzamine tout kòmantè yo te kolekte nan men moun nan kominote a konsènan opsyon dizay sa yoyo te chwazi yon dizay, e yo kontinye ap travay sou dizay la. Nou swete konnen sa w panse yon fason pou n ka  fason nou ka fèt lòt amelyorasyon anvan nou fini dizay la epi prepare nou pou  konstriksyon an ant 2026 e 2027. 

    ap  renovasyon nan ri an ak twotwa yo pou ka  l pi fasil pou moun itilizeepitou nou devlope yon dizay k ap pèmèt tout moun vwayaje nan ri a san danje, e bay opsyon transpò ki pi fyab e san danjeepi plante plis plant. Objektif nou se bay opsyon pou moun ka kouri bisiklèt nan toulede sans yo nan ri an, ann amoni ak Plan vil Somerville pou gen yon ansanm wout moun ka kouri bisiklèt san danje, toutpandan nou kenbe kèk opsyon pakin ak posiblite pou amelyore espas pyeton yo pase yo ak kote yo mete plant yoYo te rive  dizay la sou baz sa manm nan kominote a te  konnen konsènan preyokipasyon yo genyen sou transpò ak avi yo te bay sou ide ki te pwopoze yo. 

    Kounye a, nou ta renmen konnen avi w! Tanpripatisipe nan sondaj sa a ki dire 5 a 10-minit pou w ka  nou konnen kòmantè w sou dizay la e ban nou yon ti esplikasyon sou ou, sa k ap ede nou konnen pi byen ki kalite moun ki  kòmantè sa yoEpitou, ou ka rele nou nan 311 (617-666-3311) si w ta prefere patisipe nan sondaj la nan telefònoswa voye kòmantè w yo pa imel bay ekip nou an nan transportation@somervillema.gov. 


    Take Survey
    Share [Haitian Creole] Sonday sou mizajou sou dizay ri “Western Pearl Street” on Facebook Share [Haitian Creole] Sonday sou mizajou sou dizay ri “Western Pearl Street” on Twitter Share [Haitian Creole] Sonday sou mizajou sou dizay ri “Western Pearl Street” on Linkedin Email [Haitian Creole] Sonday sou mizajou sou dizay ri “Western Pearl Street” link
  • Western Pearl Street को परिमार्जित डिजाइनमा आफ्नो प्रतिक्रिया व्यक्त गर्न समय निकाल्नुभएकोमा धन्यवाद । मे 2025 मा सहरले समुदायका सदस्यहरूलाई दुई वटा डिजाइन विकल्पहरू प्रस्तुत गरेको थि‍यो । विगत केही महिनादेखि सहरले यी डिजाइन विकल्पहरूको बारेमा हामीले समुदायमा सङ्कलन गरेका सबै प्रतिक्रियाहरूको समीक्षा गर्दैएउटा डिजाइन छनौट गर्ने दिशा तय गर्दै र डिजाइनलाई अगाडि बढाउने कार्य गर्दै बितायो । डिजाइनलाई अन्तिम रूप दिनु र 2026 र 2027 को बीचमा निर्माणको तयारी गर्नु अघि हामी कसरी अझ परिवर्तनहरू गर्न सक्छौँ भनेर हेर्न हामी तपाईंको रायसुझाव सुन्न चाहन्छौँ । 

    पहुँच सुनिश्चित गर्नका लागि सडकको मर्मतसम्भार र फुटपाथहरूको पुनर्निर्माणसँगैहामीले सडकमा यात्रा गर्ने सबै मानिसहरूको सुरक्षा वृद्धि गर्नेभरपर्दो र दिगो यातायात विकल्पहरू प्रदान गर्ने र थप हरियाली समावेश गर्ने डिजाइन विकास गर्ने लक्ष्य राख्यौँ । हाम्रो लक्ष्य Somerville साइकल नेटवर्क योजनाको उद्देश्य पूरा गर्न केही पार्किङ विकल्प र क्रसवाकहरू र हरियाली क्षेत्रहरू बढाउने अवसरहरू कायम राख्दै परियोजना क्षेत्रमा दुवै दिशामा सइकल चलाउने विकल्पहरू प्रदान गर्नु थियो । यो डिजाइन समुदायका धेरै सदस्यहरू आफ्नो यातायात सुरक्षा सरोकार र अवधारणात्मक विचारहरूसहित आफ्नो प्रतिक्रियामा आधारित थियो । 

     हामी तपाईंको राय लिन चाहन्छौँ ! कृपया यो 5 देखि 10 मिनेटको सर्वेक्षणमा भाग लिएर डिजाइनको बारेमा आफ्नो प्रतिक्रिया र आफ्नो बारेमा केही विवरण प्रदान गर्नुहोस्ताकि हामी कसलाई सम्पर्क गर्दै छौँ भनेर अझ राम्रोसँग थाहा पाउन मद्दत पुग्ने छ । यदि तपाईं फोन मार्फत सर्वेक्षण पूरा गर्न चाहनुहुन्छ भने तपाईंले हामीलाई 311 (617-666-3311) मा फोन गर्न सक्नुहुन्छ वा हाम्रो टोलीलाई transportation@somervillema.gov मा आफ्नो पृष्ठपोषण ईमेल गर्न पनि सक्नुहुन्छ ।


    Take Survey
    Share [Nepalese] Western Pearl Street अद्यावधि डिजाइन प्रतिक्रिया सर्वेक्षण on Facebook Share [Nepalese] Western Pearl Street अद्यावधि डिजाइन प्रतिक्रिया सर्वेक्षण on Twitter Share [Nepalese] Western Pearl Street अद्यावधि डिजाइन प्रतिक्रिया सर्वेक्षण on Linkedin Email [Nepalese] Western Pearl Street अद्यावधि डिजाइन प्रतिक्रिया सर्वेक्षण link
  • 感謝您抽出時間就 Western Pearl Street的更新設計分享意見。市政府於 2025  5 月向社區成員展示了兩個設計方案。過去幾個月裡,市政府審閱了我們收集到的所有關於這些設計方案的社區回饋,選定了一個設計方向並持續推進。我們希望聽取您的意見,看看在最終定稿並為 2026  2027 年的施工做準備之前,我們可以如何進一步調整。 

    在重新鋪設道路並重建人行道以確保無障礙的同時,我們致力於提出一個能夠提升所有道路使用者安全、提供可靠且具永續性的交通方式、並融入更多綠化的設計。我們的目標是在專案範圍內提供雙向自行車設施,以符合 Somerville 自行車網絡規劃 (Bicycle Network Plan) 的目標,同時保留部分停車空間,並創造機會改善人行穿越道與綠化區域。此設計是由眾多與我們分享交通安全關切以及對概念方案提供意見的社區成員共同塑造。 

    我們現在想聽聽您的想法!請花 5  10 分鐘完成此調查,分享您對設計的意見,並提供一些關於您本人的資訊,以幫助我們更好地了解我們正在接觸的群體。如果您更願意透過電話完成調查,也可以致電 311 (617-666-3311),或將您的意見電郵至 transportation@somervillema.gov 


    Take Survey
    Share [Traditional Chinese] Western Pearl Street更新設計意見調查 on Facebook Share [Traditional Chinese] Western Pearl Street更新設計意見調查 on Twitter Share [Traditional Chinese] Western Pearl Street更新設計意見調查 on Linkedin Email [Traditional Chinese] Western Pearl Street更新設計意見調查 link
  • 感谢您抽出时间就 Western Pearl Street的更新设计分享反馈意见。市政府于 2025  5 月向社区成员展示了两个设计选项。过去几个月里,市政府审阅了我们收集到的所有关于这些设计选项的社区反馈意见,选择了一个设计方向并推进了设计。我们希望听取您的意见,看看在最终确定设计并为 2026  2027 年的施工做准备之前,我们可以如何进一步调整。 

    在重新铺设道路并重建人行道以确保无障碍的同时,我们致力于制定一个能够提升所有使用该街道人群安全、提供可靠且可持续的交通方式、并融入更多绿化的设计。我们的目标是在项目范围内提供双向骑行选项,以满足 Somerville 自行车网络规划 (Bicycle Network Plan) 的意图,同时保留部分停车选项,并创造机会改善人行横道和种植区域。该设计由众多与我们分享交通安全关切以及对概念性方案反馈意见的社区成员共同塑造。 

    我们现在想听听您的看法请花 5  10 分钟完成此调查,分享您对设计的反馈意见,并提供一些关于您本人的信息,帮助我们更好地了解我们正在触及的群体。如果您更愿意通过电话完成调查,也可以致电 311 (617-666-3311),或将您的反馈意见电邮至 transportation@somervillema.gov 


    Take Survey
    Share [Simplified Chinese] Western Pearl Street更新设计意见调查 on Facebook Share [Simplified Chinese] Western Pearl Street更新设计意见调查 on Twitter Share [Simplified Chinese] Western Pearl Street更新设计意见调查 on Linkedin Email [Simplified Chinese] Western Pearl Street更新设计意见调查 link
  • CLOSED: This survey has concluded.

    Thank you for taking the time to share your feedback on the Concept Design Options for the Western Pearl Street Reconstruction project. In this survey, we aim to: 

    • Hear your feedback about specific design elements. The Concept Designs provide different options that can be mixed and matched in the future final design 
    • Hear about the reasons why you prefer or not prefer certain options. 
    • See if we have met some of the safety concerns and priorities we heard about last fall. 
    • Gather any comments or questions you have about the design. 
    • Gather insight into who we are reaching in our outreach efforts. 

    This survey takes approximately 5 to 15 minutes. If you haven’t already done so, please check out the concept design roll plans to learn more about the proposal. Concept Design Option descriptions are provided below. You can also check out the following materials to learn about the concept designs in more details: 

    • The May 13 Open House informational posters describing the two main concept design options, the data we collected, and community feedback we heard. 
    • A recorded presentation from the project team. 
    • The Concept Design Options brochure. 

    If you prefer to take this survey over the phone, please contact us at 311 (617-666-3311) to log your request and a member of the Mobility Division will call you back. You can also email transportation@somervillema.gov if you have any questions or prefer to provide written comments. 

    Concept Design Options 

    Concept Design Option 1: 

    • Major intersections: A new raised crossing is added across Medford Street. The block of Medford Street north of Pearl Street is curved to connect continuously with Pearl Street. The intersection at Walnut Street has new curb extensions and both bus stops are moved to the other sides of Walnut Street. 
    • Other crosswalks and intersections: At Marshall Street, there is a raised intersection with a new crosswalk installed to the west of Marshall Street. There are raised crosswalks across the side streets intersecting with Pearl Street except at Walnut Street. There are raised crosswalks across Pearl Street at Bradley Street and Wigglesworth Street. 
    • Parking: There are parking options on the northside of Pearl Street. 
    • Bicycle facilities: There is a two-way protected bike lane connection on the southside between Medford Street and Skilton Avenue to connect to the Gilman Neighborway.  Between Skilton Avenue and McGrath Highway, there is a protected bike lane on the southside heading east. 
    • Bus stops: The bus stop by Pearl Street Park is shifted to the other side of Skilton Avenue and the sidewalk is expanded at this location to provide dedicated waiting space for bus ridersa protected bike lane to reduce bus and bike conflicts, and an in-lane stop so the bus does not have to pull in and out of the travel laneEach bus stop near Walnut Street is moved to the other sides of the intersection.  

    Concept Design Option 2: 

    • Major intersections: The segment of Pearl Street that intersects with Medford Street is curved to perpendicularly intersect with Medford Street and new raised crossings are added across Medford Street and Pearl Street. 
    • Other crosswalks and intersections: Raised crosswalks are added to all side street crossings intersecting with Pearl Street except Walnut Street.  There are raised crosswalks across Pearl Street at Marshall Street, Bradley Street, and Wigglesworth Street. 
    • Parking: There are parking options on the southside of Pearl Street. 
    • Bicycle facilities: There is a one-way protected bike lane on the northside heading west from Medford Street to McGrath Highway. Between Jasper Street and McGrath Highway, there is another one-way protected bike lane on the southside heading eastbound. 
    • Bus stops: The bus stop by Pearl Street Park has an expanded sidewalk to provide dedicated waiting space for bus riders, and an in-lane stop so the bus does not have to pull in and out of the travel lane. There is a new floating bus stop on the northside at Walnut Street.  
    Share Western Pearl Street Concept Design Feedback Survey on Facebook Share Western Pearl Street Concept Design Feedback Survey on Twitter Share Western Pearl Street Concept Design Feedback Survey on Linkedin Email Western Pearl Street Concept Design Feedback Survey link
  • CLOSED: This survey has concluded.

    Gracias por tomarse el tiempo para compartir sus comentarios sobre las opciones de diseño conceptual para el proyecto de reconstrucción de Western Pearl Street. Con esta encuesta buscamos: 

    • Escuchar sus comentarios sobre elementos de diseño específicos. Los diseños conceptuales ofrecen diferentes opciones que pueden combinarse en el diseño final futuro.   
    • Conocer las razones por las cuales prefiere o no ciertas opciones.  
    • Ver si hemos cumplido con algunas de las preocupaciones y prioridades de seguridad que escuchamos el otoño pasado.  
    • Reunir todos los comentarios o preguntas que tenga sobre el diseño.  
    • Obtener información sobre a quiénes llegamos en nuestros esfuerzos de acercamiento.   

    Contestar esta encuesta toma aproximadamente de 5 a 15 minutos. Si aún no lo ha hecho, consulte los planos de diseño conceptual para obtener más información sobre la propuesta. A continuación, se detallan las opciones de diseño conceptual. También puede consultar los siguientes materiales para obtener más información sobre los diseños conceptuales:   

    • Los carteles informativos de la jornada de puertas abiertas del 7 de mayo que describen las dos opciones principales de diseño conceptual, los datos que recopilamos y los comentarios de la comunidad que escuchamos. 
    • Una presentación grabada del equipo del proyecto. 
    • El folleto de opciones de diseño conceptual. 

    Si prefiere realizar esta encuesta por teléfono, comuníquese con nosotros al 311 (617-666-3311) para registrar su solicitud y un miembro de la División de Movilidad le devolverá la llamada. También puede escribir a transportation@somervillema.gov si tiene alguna pregunta o prefiere enviar comentarios por escrito.   

    Opciones de diseño conceptual

    Opción de diseño conceptual 1:   

    • Intersecciones principalesLa manzana de Medford Street al sur de Pearl Street tiene una curva para intersectar perpendicularmente con Medford Street y Pearl Street. En este punto, se ha instalado una nueva señal de alto y un nuevo cruce elevado sobre Medford Street. La intersección con Walnut Street cuenta con nuevas extensiones de acera y ambas paradas de autobús se han trasladado a los lados opuestos de Walnut Street.  
    • Otros cruces peatonales e interseccionesEn Marshall Street, hay una intersección elevada con un nuevo cruce peatonal al oeste de Marshall Street. Hay cruces peatonales elevados en las calles laterales que se cruzan con Pearl Street, excepto en Walnut Street. Hay cruces peatonales elevados en la intersección de Pearl Street con Bradley Street y Wigglesworth Street.  
    • EstacionamientoHay opciones de estacionamiento en el lado norte de Pearl Street. 
    • Instalaciones para bicicletasHay una ciclovía protegida de doble sentido en el lado sur, entre Medford Street y Skilton Avenue, que conecta con Gilman Neighborway. Entre Skilton Avenue y McGrath Highway, hay una ciclovía protegida en el lado sur, en dirección este. 
    • Paradas de autobusesLa parada de autobús junto al parque de Pearl Street se traslada al otro lado de Skilton Avenue y se amplía la acera en este punto para ofrecer un espacio de espera exclusivo para los pasajeros, un carril para bicicletas protegido para reducir los conflictos entre autobuses y bicicletas, y una parada dentro del carril para que el autobús no tenga que entrar y salir del carril de circulación. Todas las paradas de autobús cerca de Walnut Street se trasladan a los otros lados de la intersección.   

    Opciones de diseño conceptual:

    • Intersecciones principalesEl segmento de Pearl Street que se interseca con Medford Street se curva para intersectar perpendicularmente con Medford Street y se agregan nuevos cruces elevados entre Medford Street y Pearl Street.  
    • Otros cruces peatonales e interseccionesSe han añadido cruces peatonales elevados en todos los cruces de calles laterales que intersecan con Pearl Street, excepto en Walnut Street. Hay cruces peatonales elevados en Marshall Street, Bradley Street y Wigglesworth Street.  
    • EstacionamientoHay opciones de estacionamiento en el lado sur de Pearl Street.  
    • Instalaciones para bicicletasHay un carril para bicicletas unidireccional protegido en el lado norte, en dirección oeste, desde Medford Street hasta McGrath Highway. Entre Jasper Street y McGrath Highway hay otro carril para bicicletas unidireccional protegido en el lado sur, en dirección este. 
    • Paradas de autobusesLa parada de autobús junto al parque de Pearl Street cuenta con una acera ampliada para ofrecer un espacio de espera exclusivo para los pasajeros y una parada dentro del carril para que el autobús no tenga que entrar y salir del mismo. Hay una nueva parada de autobús flotante en el lado norte de Walnut Street.   
    Share Encuesta de opinión sobre el diseño conceptual de Western Pearl Street (Spanish) on Facebook Share Encuesta de opinión sobre el diseño conceptual de Western Pearl Street (Spanish) on Twitter Share Encuesta de opinión sobre el diseño conceptual de Western Pearl Street (Spanish) on Linkedin Email Encuesta de opinión sobre el diseño conceptual de Western Pearl Street (Spanish) link
  • CLOSED: This survey has concluded.

    Mèsi dèske ou pran tan pou bay opinyon w sou Opsyon Konsepsyon yo pou pwojè Rekonstriksyon Western Pearl Street la. Nan ankèt sa a, nou vize 

    • Tande lide pa w sou eleman espesifik nan konsepsyon yoKonsepsyon yo bay diferan opsyon ki kapab melanje epi ale ansanm nan konsepsyon final k ap vini an. 
    • Tande rezon ki  ou pito oswa pa pito kèk opsyon. 
    • Gade si nou pote repons pou enkyetid sou sekirite ak priyorite nou te tande pale de yo otòn pase a. 
    • Pran tout kòmantè oswa kesyon ou genyen konsènan konsepsyon an. 
    • Pran enfòmasyon sou kiyès nou rive atenn an efò sansibilizasyon nou yo. 

    Ankèt sa a pran anviwon 5 a 15 minit. Si ou poko  satanpri gade plan konsepsyon yo pou aprann plis sou pwopozisyon an. W ap jwenn deskripsyon opsyon konsepsyon yo pi ba a. Ou kapab gade materyèl sa yo tou pou konn plis detay sou konsepsyon yo : 

    • Postè enfòmasyon Jounen Pòt Louvri 7 me a ki dekri de opsyon konsepsyon prensipal yo, done nou te kolekte yoak opinyon kominote a ke nou te tande yo. 
    • Yon prezantasyon anrejistre ekip pwojè a. 
    • Bwochi Opsyon Konsepsyon yo. 

    Si ou pito reponn ankèt sa a nan telefòntanpri kontakte nou nan 311 (617-666-3311) pou anrejistre demann ou an epi yon manm Depatman Mobilite a ap retounen w apèl la. Ou ka voye yon imèl tou nan transportation@somervillema.gov si ou gen nenpòt kesyon oswa si w pito ekri kòmantè w yo. 

    Opsyon Konsepsyon yo 

    Opsyon Konsepsyon 1: 

    • Gwo kafou yoBlòk Medford Street sou sid Pearl Street la  yon koub pou li ka pèpandikilè ak pati kote Medford Street ak Pearl Street konekte a. Gen yon nouvo panno kanpe ak yon nouvo pasaj pyeton ki pi wo pase wout la ki ajoute pou travèse Medford Street menm kote a. Wout la  yon laji  twotwa a nan kafou Walnut Street la epi toude estasyon bis yo deplase sou lòt  Walnut Street la. 
    • Lòt pasaj pyeton ak kafouNan Marshall Street, gen yon kafou ki pi wo pase wout la avèk yon nouvo pasaj pyeton ki enstale sou  lwès Marshall Street. Genyen pasaj pyeton ki pi wo pase wout la pou travèse ri ki vin tonbe sou Pearl Street yo eksepte sou Walnut Street. Genyen pasaj pyeton ki pi wo pase wout la pou travèse Pearl Street nan Bradley Street ak Wigglesworth Street.   
    • PakinGen opsyon pakin nan zòn  Pearl Street.   
    • Enfrastrikti pou bisiklètGen yon koneksyon vwa pwoteje ale-retou pou bisiklèt nan zòn sid la ant Medford Street ak Skilton Avenue pou konekte ak katye Gilman nan. Ant Skilton Avenue ak McGrath Highway, gen yon vwa pwoteje pou bisiklèt nan zòn sid la pou ale nan lès.  
    • Estasyon bisEstasyon bis ki  Pak Pearl Street la deplase sou lòt  Skilton Avenue an epi twotwa a laji la a pou bay yon espas ki rezève pou pasaje bis yo, yon vwa pwoteje pou bisiklèt pou redui konfli ant bis ak bisiklètak yon espas pou bis yo kanpe sou vwa y ap woule dirèkteman san yo pa bezwen soti epi retounen sou vwa a. Chak estasyon bis  Walnut Street la deplase sou lòt  kafou a.    

    Opsyon Konsepsyon 2:

    • Gwo kafou yoTwonson Pearl Street ki kwaze ak Medford Street la  yon koub pou li ka pèpandikilè ak Medford Street kote yo rankontre a, epi gen nouvo pasaj pyeton ki pi wo pase wout la ki ajoute pou travèse Medford Street ak Pearl Street. 
    • Lòt pasaj pyeton ak kafouGenyen pasaj pyeton ki pi wo pase wout la pou travèse ri ki vin tonbe sou Pearl Street yo eksepte sou Walnut Street la.  Genyen pasaj pyeton ki pi wo pase wout la pou travèse Pearl Street nan Marshall Street, Bradley Street ak Wigglesworth Street.  
    • PakinGen opsyon pakin nan zòn sid Pearl Street. 
    • Enfrastrikti pou bisiklètGen yon vwa pwoteje sans inik pou bisiklèt nan zòn  a pou ale nan lwès apati Medford Street pou rive sou McGrath Highway. Ant Jasper Street ak McGrath Highway, gen yon lòt vwa pwoteje ki sans inik pou bisiklèt nan zòn sid pou ale nan lès.  
    • Estasyon bisTwotwa nan estasyon bis  Pak Pearl Street la laji pou ka bay plis espas pou pasaje yo kanpe , ak yon espas pou bis yo kanpe sou vwa y ap woule a san yo pa bezwen soti epi retouven sou vwa a.   Gen yon nouvo estasyon bis flotan sou   a sou Walnut Street la.  
    Share Ankèt Opinyon sou Konsepsyon Western Pearl Street (Haitian Creole) on Facebook Share Ankèt Opinyon sou Konsepsyon Western Pearl Street (Haitian Creole) on Twitter Share Ankèt Opinyon sou Konsepsyon Western Pearl Street (Haitian Creole) on Linkedin Email Ankèt Opinyon sou Konsepsyon Western Pearl Street (Haitian Creole) link
  • CLOSED: This survey has concluded.

    Obrigado por dedicar seu tempo para compartilhar sua opinião sobre as Opções de Projeto Conceitual para o Projeto de Reconstrução da Western Pearl Street. Com esta pesquisa, nosso objetivo é: 

    • Ouvir seu feedback sobre elementos específicos do projeto. Os Projetos Conceituais oferecem diferentes opções que poderão ser combinadas na versão final do projeto. 
    • Entender os motivos pelos quais você prefere ou não determinadas opções. 
    • Verificar se conseguimos atender a algumas das preocupações e prioridades relacionadas à segurança que foram mencionadas no outono passado. 
    • Coletar quaisquer comentários ou dúvidas que você tenha sobre o projeto. 
    • Obter informações sobre quem estamos alcançando com nossos esforços de divulgação. 

    Esta pesquisa leva aproximadamente de 5 a 15 minutos para ser concluída. Se você ainda não respondeu, confira os planos de projeto conceitual para saber mais sobre a proposta. As descrições das Opções de Projeto Conceitual estão fornecidas abaixo. Você também pode acessar os seguintes materiais para obter mais detalhes sobre os projetos: 

    • Os pôsteres informativos da Sessão Aberta realizada em 7 de maio, que descrevem as duas principais opções de projeto conceitual, os dados que coletamos e o feedback da comunidade. 
    • Uma apresentação gravada da equipe do projeto. 
    • O folheto com as Opções de Projeto Conceitual. 

    Se preferir responder a esta pesquisa por telefone, entre em contato pelo número 311 (617-666-3311) para registrar sua solicitação e um membro da Divisão de Mobilidade retornará sua ligação. Você também pode enviar um e-mail para transportation@somervillema.gov caso tenha dúvidas ou prefira enviar seus comentários por escrito. 

    Opções de Projeto Conceitual 

    Opção de Projeto Conceitual 1: 

    • Principais interseçõesO trecho da Medford Street ao sul da Pearl Street será curvado para formar um cruzamento perpendicular com a Medford Street conectada e a Pearl Street. Haverá uma nova placa de parada (stop) e uma nova travessia elevada nesse ponto da Medford Street. A interseção com a Walnut Street terá novas extensões de calçada, e ambos os pontos de ônibus serão deslocados para os lados opostos da Walnut Street.  
    • Outras faixas de pedestres e interseçõesNa Marshall Street, haverá uma interseção elevada com uma nova faixa de pedestres instalada a oeste da Marshall Street. Haverá faixas de pedestres elevadas nas ruas secundárias que cruzam a Pearl Street, exceto na Walnut Street. Haverá também faixas de pedestres elevadas atravessando a Pearl Street nas interseções com a Bradley Street e a Wigglesworth Street.   
    • EstacionamentoHaverá vagas de estacionamento disponíveis no lado norte da Pearl Street.  
    • Infraestrutura cicloviáriaSerá implantada uma ciclovia de mão dupla protegida no lado sul da via, entre a Medford Street e a Skilton Avenue, conectando ao Gilman Neighborway. Entre a Skilton Avenue e a McGrath Highway, haverá uma ciclovia protegida no lado sul da via, no sentido leste.  
    • Pontos de ônibusO ponto de ônibus próximo ao Pearl Street Park será movido para o outro lado da Skilton Avenue, e a calçada será ampliada nesse local para oferecer uma área de espera dedicada para os passageiros, uma ciclovia protegida para reduzir conflitos entre bicicletas e ônibus, e uma parada em faixa (sem baia), permitindo que o ônibus não precise sair da pista de rolamento. Cada ponto de ônibus próximo à Walnut Street será transferido para o lado oposto da interseção.  

    Opção de Projeto Conceitual: 

    • Principais intersecçõesO trecho da Pearl Street que cruza com a Medford Street será curvado para formar um cruzamento perpendicular com a Medford Street, e novas travessias elevadas serão adicionadas na Medford Street e na Pearl Street.   
    • Outras faixas de pedestres e interseçõesTravessias elevadas serão adicionadas em todas as interseções das ruas secundárias com a Pearl Street, exceto na Walnut Street. Haverá travessias elevadas na Pearl Street nas interseções com a Marshall Street, Bradley Street e Wigglesworth Street.  
    • EstacionamentoHaverá opções de estacionamento no lado sul da Pearl Street.   
    • Infraestrutura cicloviáriaHaverá uma ciclovia protegida de mão dupla no lado norte da via, no sentido oeste, entre a Medford Street e a McGrath Highway. Entre a Jasper Street e a McGrath Highway, haverá outra ciclovia protegida de mão dupla no lado sul, no sentido leste.  
    • Pontos de ônibusO ponto de ônibus próximo ao Pearl Street Park terá uma calçada ampliada para oferecer um espaço de espera dedicado para os passageiros, além de uma parada em faixa (sem baia), permitindo que o ônibus não precise sair da pista de rolamento. Será implantado um novo ponto de ônibus variável no lado norte da via, na altura da Walnut Street.   
    Share Pesquisa de Opinião sobre o Projeto Conceitual da Western Pearl Street (Portuguese) on Facebook Share Pesquisa de Opinião sobre o Projeto Conceitual da Western Pearl Street (Portuguese) on Twitter Share Pesquisa de Opinião sobre o Projeto Conceitual da Western Pearl Street (Portuguese) on Linkedin Email Pesquisa de Opinião sobre o Projeto Conceitual da Western Pearl Street (Portuguese) link
  • CLOSED: This survey has concluded.

    Western Pearl Street पुनर्निर्माण परियोजनाका लागि अवधारणा डिजाइन विकल्पहरूमा आफ्नो प्रतिक्रिया व्यक्त गर्न समय निकाल्नुभएकोमा धन्यवाद  यस सर्वेक्षणमाहाम्रा लक्ष्यहरू निम्नानुसार छन्: 

    • विशेष डिजाइन तत्वहरूको बारेमा तपाईंको प्रतिक्रिया सुनाउनुहोस्  अवधारणा डिजाइनहरूमा भविष्यमा अन्तिम डिजाइनमा मिश्रण गर्न  मिलाउन सकिने विभिन्न विकल्पहरू प्रदान गरिन्छ   
    • तपाईंले केही विकल्पहरू किन मन पराउनुहुन्छ वा मन पराउनुहुन्न भन्ने कारणहरूको बारेमा सुनाउनुहोस्  
    • गत फलमा हामीलाई व्यक्त गरिएका केही सुरक्षासम्बन्धी सरोकार  प्राथमिकताहरू पूरा गरेका छौँ कि छैनौँहेर्नुहोस्  
    • डिजाइनको बारेमा तपाईंसँग भएका कुनै पनि टिप्पणी वा प्रश्नहरू सङ्कलन गर्नुहोस्  
    • हाम्रा आउटरिच प्रयासहरूमा हामी कोसम्म पुगिरहेका छौँ भन्ने बारे अन्तर्दृष्टि सङ्कलन गर्नुहोस्  

    यो सर्वेक्षण पूरा गर्न लगभग 5 देखि 15 मिनेट लाग्ने   यदि तपाईंले पहिले नै त्यसो गर्नुभएको छैन भनेप्रस्तावको बारेमा थप जानकारीको लागि कृपया अवधारणा डिजाइन रोल योजनाहरू हेर्नुहोस्  अवधारणा डिजाइन विकल्प विवरण तल प्रस्तुत गरिएको   थप विवरणमा अवधारणा डिजाइनहरूको बारेमा जानकारी पाउनको लागि तपाईंले निम्न सामग्रीहरू पनि हेर्न सक्नुहुन्छ: 

    • मे 7 को ओपन हाउस जानकारीमूलक पोस्टरहरूमा दुई मुख्य अवधारणा डिजाइन विकल्पहरूहामीले सङ्कलन गरेको डेटा  हामीलाई बताइएको समुदायको प्रतिक्रिया वर्णन गरिएको   
    • परियोजना टोलीबाट रेकर्ड गरिएको प्रस्तुति  
    • अवधारणा डिजाइन विकल्पहरूको ब्रोसर  

    यदि तपाईं फोनबाट यो सर्वेक्षण पूरा गर्न चाहनुहुन्छ भनेकृपया आफ्नो अनुरोध दर्ता गर्न हामीलाई 311 (617-666-3311) मा सम्पर्क गर्नुहोस्  गतिशीलता डिभिजनका सदस्यले तपाईंलाई फोन गर्ने छन्  यदि तपाईंसँग कुनै प्रश्नहरू छन् वा लिखित टिप्पणीहरू प्रदान गर्न चाहनुहुन्छ भनेतपाईंले transportation@somervillema.gov मा इमेल पनि गर्न सक्नुहुन्छ 

    अवधारणा डिजाइनका विकल्पहरू

    अवधारणा डिजाइनका विकल्पहरू 1: 

    • मुख्य चौबाटोहरूPearl Street को दक्षिणमा रहेको Medford St को ब्लकलाई जोडिएको Medford St  Pearl Street सँग समकोणमा काट्न बङ्ग्याइएको   यस स्थानमा Medford Street मा एउटा नयाँ स्टप (रोक्नसङ्केत  नयाँ उठाइएको क्रसिङ    Walnut Street को चौबाटोमा नयाँ कर्ब एक्सटेन्सनहरू छन्  दुबै बस स्टपहरू Walnut Street को अर्कोपट्टि सारिएको    
    • अन्य क्रसवाक  चौबाटोहरू Marshall Street माMarshall Street को पश्चिमतिर जडान गरिएको नयाँ क्रसवाकसँग एउटा उठाइएको चौबाटो   Walnut Street  बाहेक Pearl Street सँग जोडिएका दायाँ-बायाँ सडकहरूमा उठाइएका क्रसवाकहरू छन्  Pearl Street भरि Bradley Street  Wigglesworth Street मा उठाइएका क्रसवाकहरू छन्   
    • पार्किङ Pearl Street को उत्तर तर्फ पार्किङ विकल्पहरू छन्   
    • साइकलका लागि सुविधाहरू Gilman Neighborway मा जोड्न Medford Street  Skilton Avenue को बिचमा दक्षिणतर्फ दुई-तर्फी सुरक्षित बाइक लेन कनेक्सन    Skilton Avenue   McGrath Highway को बिचमापूर्वतिर जाने बाटोमा दक्षिणतर्फ एउटा सुरक्षित बाइक लेन    
    • बस बिसौनीहरूPearl Street पार्कसँगै रहेको बस बिसौनीलाई Skilton Avenue को अर्को छेउमा सारिएको   बस यात्रुहरूका लागि समर्पित प्रतीक्षा गर्ने स्थानबस  साइकल बिचको द्वन्द्व कम गर्न सुरक्षित बाइक लेन  बस यात्रा गरिरहेको लेनबाट भित्र  बाहिर गर्न नपरोस् भनेर लेनभित्र नै बिसौनी प्रदान गर्न यस स्थानमा फुटपाथ विस्तार गरिएको   Walnut Street  नजिकै रहेका प्रत्येक बस बिसौनीलाई चौबाटोको अर्को छेउमा सारिएको     

    अवधारणा डिजाइनका विकल्पहरू 2: 

    • मुख्य चौबाटोहरूMedford Street सँग काट्ने Pearl Street को खण्डलाई Medford Street सँग समकोणमा काट्न बङ्ग्याइएको   Medford Street  Pearl Street भरि नयाँ उठाइएका क्रसिङहरू थपिएको    
    • अन्य क्रसवाक  चौबाटोहरूWalnut Street  बाहेक Pearl Street सँग काट्ने सबै साइड सडक क्रसिङहरूमा उठाइएका क्रसवाकहरू थपिएका छन्   Pearl Street भरि Marshall StreetBradley Street  Wigglesworth Street मा उठाइएका क्रसवाकहरू छन्   
    • पार्किङ Pearl Street को दक्षिणतर्फ पार्किङ विकल्पहरू छन्    
    • साइकलका लागि सुविधाहरू Medford Street बाट McGrath Highway तर्फ पश्चिमतर्फ जाने उत्तरतर्फ एकतर्फी सुरक्षित बाइक लेन   Jasper Street   McGrath Highway को बिचमापूर्वतिर जाने बाटोमा दक्षिणतर्फ एउटा सुरक्षित बाइक लेन    
    • बस बिसौनीहरूPearl Street पार्कको बस बिसौनीमा बस यात्रुहरूका लागि समर्पित प्रतीक्षा स्थल प्रदान गर्न  बसले यात्रा गरिरहेको लेनबाट भित्र  बाहिर गर्नु नपरोस् भनेर लेनभित्रै बिसौनीकोव्यवस्था गर्न विस्तारित फुटपाथ बनाइएको   Walnut Street को उत्तर तर्फ एउटा नयाँ फ्लोटिङ बस बिसौनी     
    Share Western Pearl Street अवधारणा डिजाइन प्रतिक्रिया सर्वेक्षण परिचय (Nepali) on Facebook Share Western Pearl Street अवधारणा डिजाइन प्रतिक्रिया सर्वेक्षण परिचय (Nepali) on Twitter Share Western Pearl Street अवधारणा डिजाइन प्रतिक्रिया सर्वेक्षण परिचय (Nepali) on Linkedin Email Western Pearl Street अवधारणा डिजाइन प्रतिक्रिया सर्वेक्षण परिचय (Nepali) link
  • CLOSED: This survey has concluded.

    感謝您抽出寶貴時間參與本次 Western Pearl Street 重建工程概念設計的意見調查。 通過本次調查,我們希望達成以下目標 

    • 收集您對各項設計要點的意見。 當前方案包含多種可組合的設計選項,將作為未來最終設計的參考。 
    • 理解您選擇或不選擇某些設計方案的原因。 
    • 評估去年秋季收集到的安全隱患問題及優先事項是否已得到妥善回應。 
    • 收集您在閱讀設計方案后的任何問題或建議。 
    • 評估我們外聯工作覆蓋範圍的反饋。 

    本次調查預計需時5至15分鐘完成。 若您還未查閱概念設計圖紙,建議您先行查閱,以便更全面地掌握該提案的相關信息。 以下是概念設計方案的詳細說明。 您也可瀏覽以下資料,以深入解概念設計的細節: 

    • 5月13日開放日的宣傳海報,展示了兩個核心設計方案、我們所收集的相關數據,以及來自社區的反饋意見。 
    • 項目團隊製作的講解視頻。 
    • 概念設計方案介紹手冊。 

    如果您希望通過電話參與本次意見調查,請致電 311 熱線(617-666-3311)提交您的要求,交通局專員將與您電話聯繫。 您亦可發送郵件至transportation@somervillema.gov,諮詢任何疑問或提交書面建議。 

    概念設計選項 

    概念設計選項一: 

    • 主要交叉口 Medford Street 增設一處抬高的人行道設施。 Pearl Street 以北的 Medford Street 路段將調整為彎曲設計,與Pearl Street 流暢連接Pearl Street 以南的 Medford Street路段也將改造為彎道,以垂直方式連接的 Medford Street  Pearl Street。 Medford Street 在此位置將新加一個停讓標誌抬高的人行道。  Walnut Street 交叉口將增設路緣延伸設計,並將原有的兩個公車站點分別移至 Walnut 街的對側位置。   
    • 其他人行道設施與路口設計 Marshall Street 將設置抬高的交叉口,並在 Marshall Street 西側新增了人行道。 除 Walnut Street 外,與 Pearl Street 相交的所有支路均設有抬高的人行道。 此外,Pearl Street 上的 Bradley Street  Wigglesworth Street 路段也設置了抬高的人行道 
    • 停車Pearl Street 北側設有停車區域。   
    • 自行車設施在Medford Street和Skilton Avenue之間的南側設有一條雙向防護型自行車道,與 Gilman Neighborway 相連。 在 Skilton Avenue  McGrath Highway 之間的南側,還設有一條東向的防護型自行車道。   
    • 公交車站 原位於 Pearl Street Park 附近的公交站將遷移至 Skilton Avenue 對面,同時擴寬該處人行道,為乘客增設公交乘客專用候車區、設置防護型自行車道以減少公交與自行車之間的衝突此外,設置車道內停靠設計,使公交車在上下客時無需駛離原有行車道。 Walnut Street 附近所有公交車站均移至交叉口的另一側。   

    概念設計選項二: 

    • 主要交叉口 Medford Street 相交的 Pearl Street 路段彎曲,與 Medford Street 垂直相交。 該路段在 Medford Street  Pearl Street 均增設了抬高的人行道  
    • 其他人行道設施與路口設計除 Walnut Street 外,Pearl Street 與所有支路的交叉口均新增抬高的人行道。 此外,Pearl Street 上在與 Marshall Street、Bradley Street 和 Wigglesworth Street 的交匯處也設置了抬高的人行道 
    • 停車Pearl Street 南側設有停車區域。   
    • 自行車設施在Medford Street向西延伸至 McGrath Highway 之間的北側設有一條單向防護型自行車道。 在 Jasper Street 和 McGrath Highway 之間的南側,還設有一條單向東行的防護型自行車道  
    • 公交車站Pearl Street 公園附近的公交站擴寬了人行道區域,為乘客增設公交乘客專用候車區,設置車道內停靠設計,使公交車在上下客時無需駛離原有行車道。Walnut Street 北段新增了一座浮動式公交站。 
    Share Western Pearl Street 概念設計意見調查 (Traditional Chinese) on Facebook Share Western Pearl Street 概念設計意見調查 (Traditional Chinese) on Twitter Share Western Pearl Street 概念設計意見調查 (Traditional Chinese) on Linkedin Email Western Pearl Street 概念設計意見調查 (Traditional Chinese) link
  • CLOSED: This survey has concluded.

    感谢您抽出宝贵时间参与本次 Western Pearl Street 重建工程概念设计的意见调查。通过本次调查,我们希望达成以下目标 

    • 获取您对各项设计要点的意见。当前方案包含多种可组合的设计选项,供未来终版设计参考 
    • 理解您选择或不选择某些设计方案的原因 
    • 评估去年秋季收集到的安全隐患关注点及优先事项是否得到妥善回应 
    • 收集您在阅读设计方案后的任何问题或建议 
    • 评估我们外联工作覆盖范围的反馈 

    本次调查预计需要5至15分钟完成。若您尚未查阅概念设计图纸,建议查阅,以便更全面地掌握该提案的相关信息。以下是概念设计方案的具体说明。您也可浏览以下资料,以深入了解概念设计的细节 

    • 5月13日开放日的宣传海报,展示了两个核心设计方案、我们所收集的相关数据,以及来自社区的反馈意见。 
    • 项目团队制作的讲解视频 
    • 概念设计方案介绍手册 

    如果您希望通过电话参与本次意见调查,请致电 311 热线(617-666-3311)提交您的请求,交通局专员将与您电话联系。您亦可发送邮件至 transportation@somervillema.gov 咨询任何疑问或提交书面建议 

    概念设计选项 

    概念设计选项一 

    • 主要交叉口 Medford Street 增设一处抬高的人行道设施。Pearl Street 以北的 Medford Street 路段将调整为弯曲设计,与Pearl Street 流畅连接;Pearl Street 以南的 Medford Street路段也将改造为弯道,以垂直方式连接Medford Street  Pearl StreetMedford Street 在此位置将新加一个让行标识,还有抬高的人行道 Walnut Street 交叉口将增设路缘延伸设计,并将原有的两个公交站点分别移至 Walnut Street 街的对侧位置  
    • 其他人行道设施与路口设计  Marshall Street 将设置抬高的交叉口,并在 Marshall Street 西侧新增了人行道。除 Walnut Street 外,与 Pearl Street 相交的所有支路均设有抬高的人行道。此外,Pearl Street 上的 Bradley Street  Wigglesworth Street 路段也设置了抬高的人行道  
    • 停车Pearl Street 北侧设有停车区域  
    • 自行车设施 Medford StreetSkilton Avenue之间的南侧设有一条双向防护型自行车道,与 Gilman Neighborway 相连。在 Skilton Avenue  McGrath Highway 之间的南侧,还设有一条东向的防护型自行车道  
    • 公交车站 位于 Pearl Street Park 附近的公交站将迁移至 Skilton Avenue 对面,同时扩宽该处人行道,为乘客增设公交乘客专用候车区、设置防护型自行车道以减少公交与自行车之间的冲突。此外,设置车道内停靠设计,使公交车在上下客时无需驶离原有行车道。Walnut Street 附近所有公交车站均移至交叉口的另一侧   

    概念设计选项 

    • 主要交叉口 Medford Street 相交的 Pearl Street 路段弯曲,与 Medford Street 垂直相交。该路段在 Medford Street  Pearl Street 均增设了抬高的人行道 
    • 其他人行道设施与路口设计除 Walnut Street 外,Pearl Street 与所有支路的交叉口均新增抬高的人行道。此外,Pearl Street 上在与 Marshall Street、Bradley Street 和 Wigglesworth Street 的交汇处也设置了抬高的人行道  
    • 停车Pearl Street 南侧设有停车区域  
    • 自行车设施 在Medford Street向西延伸至McGrath Highway 之间的北侧设有一条单向防护型自行车道。在 Jasper Street 和 McGrath Highway 之间的南侧,还设有一条单向东行的防护型自行车道   
    • 公交车站 Pearl Street 公园附近的公交站扩宽了人行道区域,为乘客增设公交乘客专用候车区,设置车道内停靠设计,使公交车在上下客时无需驶离原有行车道。Walnut Street 北段新增了一座浮动式公交站 
    Share Western Pearl Street 概念设计意见调查 (Simplified Chinese) on Facebook Share Western Pearl Street 概念设计意见调查 (Simplified Chinese) on Twitter Share Western Pearl Street 概念设计意见调查 (Simplified Chinese) on Linkedin Email Western Pearl Street 概念设计意见调查 (Simplified Chinese) link
  • CLOSED: This survey has concluded.

    Thank you for taking the time to provide feedback on Western Pearl Street, between McGrath Highway and Medford StreetThe City is planning to reconstruct the sidewalks and repave the street over the next couple of years. As part of this effort, we aim to explore a new design that makes it safer for people walking, rolling, biking, taking the bus, and driving. We want to hear about your experience on the street, listen to your transportation safety concerns, and gather feedback on ways to improve Western Pearl Street 

    Please take this 5 to 7-minute survey to provide your input on the future redesign of Western Pearl Street and tell us a bit about yourself. For more details about the project: 

    • check out details on the project website 
    • review the community meeting presentation slides (available in English) 
    • watch the recording of the virtual community meeting held on October 9, 2024 (available in English) 

    You can also call us at 311 (617-666-3311) if you would prefer to conduct the survey over the phone or email your feedback to our team at transportation@somervillema.gov. If you want to get regular email updates about the project, please subscribe to the Monthly Mobility Newsletter. 

    Share Western Pearl Street Transportation Safety Concerns and Needs Survey on Facebook Share Western Pearl Street Transportation Safety Concerns and Needs Survey on Twitter Share Western Pearl Street Transportation Safety Concerns and Needs Survey on Linkedin Email Western Pearl Street Transportation Safety Concerns and Needs Survey link
  • CLOSED: This survey has concluded.

    Gracias por tomarse el tiempo para dar su opinión sobre Western Pearl Street, entre McGrath Highway y Medford Street. La Ciudad está planificando reconstruir las aceras y repavimentar la calle en los próximos años. Como parte de este esfuerzo, nuestro objetivo es explorar un nuevo diseño que lo haga más seguro para las personas al caminar, moverse, andar en bicicleta, tomar el autobús y conducir. Queremos escuchar sobre su experiencia en la calle, escuchar sus preocupaciones acerca de la seguridad del transporte y recopilar comentarios sobre las formas de mejorar Western Pearl Street.

    Por favor, tome esta encuesta de 5 a 7 minutos para proporcionar su opinión sobre el futuro rediseño de Western Pearl Street y cuéntenos un poco sobre usted. Para más detalles sobre el proyecto:  

    • consulte los detalles en el sitio web del proyecto 
    • revise las diapositivas de la presentación de la reunión comunitaria (disponible en inglés) 
    • vea la grabación de la reunión comunitaria virtual realizada el 9 de octubre de 2024 (disponible en inglés)

    También puede llamarnos al 311 (617-666-3311) si prefiere hacer la encuesta por teléfono o enviar sus comentarios por correo electrónico a nuestro equipo a transportation@somervillema.gov. Si desea recibir novedades sobre el proyecto por correo electrónico, suscríbase a Boletín Mensual de Movilidad.  

    Share Encuesta Sobre las Preocupaciones y Necesidades de la Seguridad del Transporte en Western Pearl Street [Spanish] on Facebook Share Encuesta Sobre las Preocupaciones y Necesidades de la Seguridad del Transporte en Western Pearl Street [Spanish] on Twitter Share Encuesta Sobre las Preocupaciones y Necesidades de la Seguridad del Transporte en Western Pearl Street [Spanish] on Linkedin Email Encuesta Sobre las Preocupaciones y Necesidades de la Seguridad del Transporte en Western Pearl Street [Spanish] link
  • CLOSED: This survey has concluded.

    Mèsi paske w konsidere sa epi pataje panse w sou Western Pearl Street (zòn ki genyen ant McGrath Highway ak Medford Street). Vil la gen entansyon repave lari a ak rekonstwi twotwa yo nan pwochen ane kap vini yo. Nan kad inisyativ sa a, nou vle eksplore yon nouvo konsepsyon ki amelyore sekirite chofè yo, pyeton yo, siklis yo, pasaje bis yo ak moun ki sou wou yo. Pataje opinyon w ak panse w sou Western Pearl Street, sekirite transpò piblik, ak enpresyon jeneral ou sou lari a. 

    Nan ti sondaj  sa a (5-7 minit), nou tap apresye si w pataje enfòmasyon sou tèt ou epi eksprime opinyon w sou pwojè redesign Western Pearl Street la. Konsènan detay pwojè a:

    • Pou plis enfòmasyon gade sit entènèt pwojè a
    • Gade dyapozitif prezantasyon anglè yo nan reyinyon kominotè a.
    • Gade anrejistreman angle reyinyon kominote vityèl la nan dat 9 oktòb 2024 la.

    Epitou, ou kapab rele nou nan 311 (617-666-3311) si w ta renmen reponn ankèt la pa mwayen telefòn oswa voye kòmantè w yo pa mwayen imel bay ekip nou an nan transportation@somervillema.gov. Si, regilyèman, ou ta renmen jwenn mizajou ki genyen pou pwojè a, tanpri enskri nan Jounal chak mwa sou sijè ki gen rapò ak transpò ak deplasman.

    Share Demann ak Kesyon Sondaj pou Sekirite Transpò Western Pearl Street. [Haitian Creole] on Facebook Share Demann ak Kesyon Sondaj pou Sekirite Transpò Western Pearl Street. [Haitian Creole] on Twitter Share Demann ak Kesyon Sondaj pou Sekirite Transpò Western Pearl Street. [Haitian Creole] on Linkedin Email Demann ak Kesyon Sondaj pou Sekirite Transpò Western Pearl Street. [Haitian Creole] link
  • CLOSED: This survey has concluded.

    Obrigado por dedicar seu tempo para fornecer feedback sobre a Western Pearl Street, situada entre a McGrath Highway e a Medford Street. A cidade está planejando reconstruir as calçadas e renovar o pavimento da rua nos próximos dois anos. Como parte desse esforço, nosso objetivo é explorar um novo projeto que torne a rua mais segura para pedestres, cadeirantes, ciclistas, usuários de ônibus e motoristas. Queremos saber sobre sua experiência na rua, ouvir suas preocupações em relação à segurança no trânsito e coletar sugestões sobre como melhorar a Western Pearl Street.   

    Por favor, responda a esta pesquisa de 5 a 7 minutos para nos dar sua opinião sobre o futuro design da Western Pearl Street e nos contar um pouco sobre você. Para mais detalhes sobre o projeto:  

    • Confira os detalhes no site do projeto  
    • revise os slides da apresentação da reunião comunitária (disponíveis em inglês)  
    • assista à gravação da reunião comunitária virtual realizada em 9 de outubro de 2024 (disponível em inglês)  

    Você também pode ligar para o 311 (617-666-3311) se preferir responder à pesquisa por telefone ou enviar seus comentários para nossa equipe pelo e-mail transportation@somervillema.gov. Se quiser receber atualizações regulares sobre o projeto por e-mail, inscreva-se no Boletim Informativo Mensal sobre Mobilidade. 

    Share Pesquisa sobre Preocupações e Necessidades de Segurança no Trânsito da Western Pearl Street [Portuguese] on Facebook Share Pesquisa sobre Preocupações e Necessidades de Segurança no Trânsito da Western Pearl Street [Portuguese] on Twitter Share Pesquisa sobre Preocupações e Necessidades de Segurança no Trânsito da Western Pearl Street [Portuguese] on Linkedin Email Pesquisa sobre Preocupações e Necessidades de Segurança no Trânsito da Western Pearl Street [Portuguese] link
  • CLOSED: This survey has concluded.

    McGrath Highway  Medford Street को बिचमा रहेको Western Pearl Street को बारेमा प्रतिक्रिया दिन समय निकाल्नुभएकोमा धन्यवाद  महानगरले आगामी दुई वर्षभित्र फुटपाथ पुनर्निर्माण  मार्ग मर्मत गर्ने योजना बनाएको   यस प्रयासको एक अङ्गको रूपमाहामी हिँड्दारोलर स्केटिङ गर्दासाइकल चलाउँदाबस चढ्दा  ड्राइभिङ गर्दा मानिसहरूलाई सुरक्षित बनाउने एउटा नयाँ डिजाइन अन्वेषण गर्ने लक्ष्य राखेका छौँ  हामी मार्गमा तपाईंको अनुभवतपाईंका यातायात सुरक्षा सम्बन्धी सरोकारहरूको बारेमा सुन्न चाहन्छौँ  Western Pearl Street सुधार गर्ने तरिकाहरूका सम्बन्धमा प्रतिक्रिया सङ्कलन गर्न चाहन्छौँ   

    कृपया यो 5 देखि 7 मिनेटको सर्वेक्षणमा Western Pearl Street को भविष्यको रिडिजाइनका सम्बन्धमा आफ्नो राय-सुझाव प्रदान गर्नुहोस्  हामीलाई आफ्नो बारेमा केही कुराहरू बताउनुहोस्  परियोजनाको बारेमा थप विवरणका लागि: 

    • परियोजनाको वेबसाइटमा विस्तृत विवरण हेर्नुहोस् 
    • सामुदायिक बैठकका प्रस्तुतीकरण स्लाइडहरू अध्ययन गर्नुहोस् (अङ्ग्रेजी भाषामा उपलब्ध) 
    • 2024 को अक्टोबर 9 तारिखमा भएको भर्चुअल सामुदायिक बैठकको रेकर्डिङ हेर्नुहोस् (अङ्ग्रेजी भाषामा उपलब्ध) 

    अब हामी तपाईंको राय लिन चाहन्छौँ ! प्रस्तावित डिजाइनमा आफ्नो पृष्ठपोषण प्रदान गर्न यो सर्वेक्षण पूरा गर्नुहोस् । यदि तपाईं फोन मार्फत सर्वेक्षण पूरा गर्न चाहनुहुन्छ भने तपाईंले हामीलाई 311 (617-666-3311) मा फोन गर्न सक्नुहुन्छ वा हाम्रो टोलीलाई transportation@somervillema.gov मा आफ्नो पृष्ठपोषण ईमेल गर्न पनि सक्नुहुन्छ । यदि तपाईं परियोजनाको बारेमा नियमित इमेल अपडेटहरू प्राप्त गर्न चाहनुहुन्छ भनेकृपया मासिक गतशीलता न्युजलेटर का लागि नाम दर्ता गर्नुहोस् । 

    Share [Nepali] Western Pearl Street यातायात सुरक्षा सरोकार तथा आवश्यकता सर्वेक्षण on Facebook Share [Nepali] Western Pearl Street यातायात सुरक्षा सरोकार तथा आवश्यकता सर्वेक्षण on Twitter Share [Nepali] Western Pearl Street यातायात सुरक्षा सरोकार तथा आवश्यकता सर्वेक्षण on Linkedin Email [Nepali] Western Pearl Street यातायात सुरक्षा सरोकार तथा आवश्यकता सर्वेक्षण link
  • CLOSED: This survey has concluded.

    感謝您抽出寶貴時間 Western Pearl Street 提供回饋街道位於 McGrath Highway  Medford Street 之間。市政府計畫在未來幾年內重建行人步道並重新鋪設街道。作為這項工作的部分,我們計畫探索一種新的設計,讓行人、輪椅使用者、自行車騎行者、巴士乘客和汽車司機在這裡更安全。我們希望瞭解您在這條街道上的出行體驗,傾聽您對交通安全的擔憂,並收集您對改善 Western Pearl Street 的回饋意見。 

    請花 5  7 分鐘時間完成這項問卷調查提供您對 Western Pearl Street 未來重新設計的意見並告訴我們一些關於您本人的資訊。如需瞭解更多關於該專案的詳細資訊,您可以: 

    • 查看專案網站上的詳細資訊 
    • 流覽社區會議的簡報(提供英語版) 
    • 觀看 2024  10  9 日舉行的社區線上會議的錄影(提供英語版)

    如果您想通過電話完成調查,也可以致電311617-666-3311)聯繫我們或將您的饋通過電子郵件發送給我們的團隊:transportation@somervillema.gov。如果您想定期收到有關該項目的電子郵件最新消息,請訂閱每月移動通訊 

    Share [Traditional Chinese] 關於 Western Pearl Street 交通安全問題和需求的問卷調查 on Facebook Share [Traditional Chinese] 關於 Western Pearl Street 交通安全問題和需求的問卷調查 on Twitter Share [Traditional Chinese] 關於 Western Pearl Street 交通安全問題和需求的問卷調查 on Linkedin Email [Traditional Chinese] 關於 Western Pearl Street 交通安全問題和需求的問卷調查 link
  • CLOSED: This survey has concluded.

    感谢您抽出时间为 Western Pearl Street 提供反馈,该街道位于 McGrath Highway  Medford Street 之间。市政府计划在未来几年内重建人行道并重新铺设街道。作为这项工作的部分,我们计划探索一种新的设计,让行人、轮椅使用者、自行车骑行者、巴士乘客和汽车司机在这里更安全。我们希望了解您在这条街道上的出行体验,倾听您对交通安全的担忧,并收集您对改善 Western Pearl Street 的反馈意见。 

    请花 5  7 分钟时间完成这项问卷调查提供您对 Western Pearl Street 未来重新设计的意见并告诉我们一些关于您本人的信息。如需了解更多关于该项目的详细信息,您可以: 

    • 查看项目网站上的详细信息 
    • 浏览社区会议演示幻灯片(提供英语版) 
    • 观看 2024  10  9 日举行的社区线上会议的录像(提供英语版) 

    如果您想通过电话完成调查,也可以致电311617-666-3311)联系我们或将您的反馈通过电子邮件发送给我们的团队:transportation@somervillema.gov。如果您想定期收到有关该项目的电子邮件最新消息,请订阅每月移动通讯 

    Share [Simplified Chinese] 关于 Western Pearl Street 交通安全问题和需求的问卷调查 on Facebook Share [Simplified Chinese] 关于 Western Pearl Street 交通安全问题和需求的问卷调查 on Twitter Share [Simplified Chinese] 关于 Western Pearl Street 交通安全问题和需求的问卷调查 on Linkedin Email [Simplified Chinese] 关于 Western Pearl Street 交通安全问题和需求的问卷调查 link
Page last updated: 10 Oct 2025, 12:26 PM